Working under
extremely tight time frames imposed
by the school’s calendar, Triangle
removed two layers of old roof, including
asbestos, and installed an Asphalt Build-Up
Roof from Garland. Compounding the time
constraints was the roof layout itself
– several different levels required
extensive and careful interfacing.